USBRL Project Brings All-Weather Rail Connectivity to Kashmir with World-Class Safety Features
Union Railways Minister Ashwini Vaishnaw has announced the successful commissioning of the Udhampur-Srinagar-Baramulla Rail Link (USBRL), describing it as one of India’s most technically complex and ecologically sensitive railway projects. Built across the challenging Himalayan terrain, the 272-kilometer line integrates global-standard safety protocols with minimal environmental disruption.
The rail link stretches through Udhampur, Reasi, Ramban, Anantnag, Pulwama, Budgam, Srinagar, and Baramulla districts. It features two engineering marvels: the world’s tallest railway bridge over the Chenab River (359 meters above the riverbed), and Indian Railways’ first-ever cable-stayed bridge over Anji Khad.
Udhampur-Srinagar-Baramulla Rail Link to Drive Tourism and Employment
The Udhampur-Srinagar-Baramulla Rail Link has created over 5 crore man-days of employment and dramatically improved regional infrastructure with 215 km of approach roads, 320 bridges, and multiple tunnels. For passenger safety, 66 km of escape tunnels and advanced fire-fighting systems have been installed, along with mechanical ventilation in tunnels longer than 2 km.
According to Mr. Vaishnaw’s written statement in the Lok Sabha, slope stabilization technologies developed by IISc Bengaluru, IIT Delhi, and international experts were used to ensure environmental safety. The all-weather connectivity offered by USBRL is expected to significantly boost tourism, trade, and job opportunities in Jammu and Kashmir, providing a major push to the region’s socio-economic development.
Get Latest News Live on MTIMES along with Breaking News and Top Headlines, Political News and around The World.
You May Like
Trending Searches Today |
NEET PG 2025 Exam Analysis: Difficulty Level, Paper Review & Good Attempts
“India Struck Pakistan Hard and Smart”: Tharoor Praises Operation Sindoor in the US
India-US Joint Mission NISAR Launched Successfully by ISRO’s GSLV-F16
Trump Signs Executive Order Imposing New Tariffs on 68 Countries, Including India Allies
Asia Cup 2025: India to Clash with Pakistan on September 14 in UAE
AI for India 2.0 Empowers Rural Youth
- Resolution: 4K LED (3840 x 2160) | Refresh Rate: 60 Hertz
- Connectivity: 3 HDMI Ports | 2 USB ports | 1 Lan | 1 Satellite Input | 1 Optical Audio Out | 1 AV IN Adapter
- Sound: 30 Watts output | Dolby Atmos, Dts-X
- Resolution: HD Ready (1366×768) | Refresh Rate: 60 hertz | Resolution Upscaler | 178 Degree wide viewing angle
- Connectivity: 2 HDMI ports to connect set top box, Blu Ray players, gaming console | 1 USB ports to connect hard drives …
- Sound: 10 Watts Output | Dolby Digital Plus Sound Configuration | AI Sound | Virtual Surround 5.1 | Bluetooth Surround R…
- Resolution: HD Ready (1366×768) | Refresh Rate: 60 Hertz
- Connectivity: Dual band Wifi | 2-Way Bluetooth 5.0 | AV, RF, Ethernet, headphone×1 | HDMI Ports 1.4 x 3 to connect perso…
- Sound: PRO Tuned Speakers | 24 Watts Output | High Fidelity Speakers | Dolby Audio | 5 Preset Smart Equalizer